FLUVIAL PATH | CAMBADOS
The purpose of the project is to recover an old path used by fishermen and farmers in the area that runs parallel to the Umia river up to its mouth at the A Barca bridge.
The layout of the new path is arranged in straight zigzag sections to differentiate it from the paths of the surrounding farms.
Given its proximity to the course of the river, the path rises 80 centimeters above the ground to protect it from the constant floods produced by the tides.
All the elements used in its construction are made of wood, from the decking to the foundations, giving the path a more natural character, in keeping with the environment.
